A glimpse into the infrastructure, production, and people that power Maruthi Auto Components.
Conducting receiving Inspection
Tube cross cutting SPM Cutting machine.
Perfectly maintained Files in Rack System.
Traub Machines, Soco Cutting Machines, Soco Chamfering Machine, WIP Area and Inspection area viewed from Office .
Operator operating SOCO cutting machine.
Team with Quality head and CEO checking for the quality of the produced products conducting In-Process Inspection.
MAC team.
Every 6 months employee training is conducted.
Dimensions of the product is checked with reference to the customer drawings.
WIP, Traub Machines, SOCO cutting Machine, SOCO Chamfering machine.
Operator placing chamfering parts.
Raw material storage area, Loading Unloading Area, Bin Storage area.
Well organized Unit1, a look from entrance.
.
Storage bins organised based on the sizes and colour.
Team at snack area.
Teams spirit.
Final Inspection and Welding Area of Corner Piece.
Inspection Area and Welding Area.
Team in production of Corner Piece.
WIP .
Threading done for Bolts.
Quality check.
Work in process.
Lean Concept implemented for Corner Piece Production.
Shop Floor.
Sir holds the initial sample piece produced by the Laser Cutting Machine
Inauguration with Pooja for Laser Cutting machine.
Welding of Corner Piece and InProcess Inspection
Sufficient to allow entry for large trucks or container carriers
Maintains a clean and organized inspection workstation using 5S System.
Corner piece cycle time is displayed on the board for all the employees reference
Look at the board our processes are in accordance with ISO standards
A formal gathering of employees with the Chief Executive Officer
Rest place for employees
Each team is assigned to specific zones and following the safety protocols
A well-structured setup with a clean infrastructure
Well-arranged dispatch system for corner piece
A skilled inspector checks each product before dispatch.
Everyone has zone and follows safety rules
Our employees are skilled, efficient, and follow safety protocols
Every employee records in-process inspection
Finished products are inspected by the CEO to ensure quality standards.
A traditional farewell was held for the resigned employees
CEO’s appreciation for their contribution.
Team members are missing the resigned employees.
Resigned members received gifts during the farewell.
Resigned members received gifts during the farewell.
The customer participated in the celebration with the employees.
Drilling a corner piece by a trained operator.
Chamfering of the corner piece is performed at this point
A trained operator performs tapping on the corner piece
Employees engage in morning prayer sessions before work.
Corner piece inspection training conducted by the CEO
wishes for Resigned Employees
All the MAC Products displayed here
Daily production details and Issues discussing with employees.
Best wishes to Employees who have resigned
Dedicated and disciplined team working at the Corner Piece Assembly area.
A Skilled Quality technician trained for load testing